Denbridge
|
Trackwork is complete on the lower level, with
planning for the upper nearing completion. The
layout is operated regularly on running nights using
temporary
wiring, which is being replaced with the permanent wiring in a
progressive
manner. Control panels are being
finished, with one in partial operation at present.
Route setting is being incorporated for the
points to the storage loops. Although
the layout is wired for traditional dc operation, it is arranged such
that it
may be connected to operate with DCC and this has been done
successfully on
specific evenings. Scenery is
progressing at the front of the layout and, in particular, at the
parcels depot
corner by the end of the off – scene station. |